Production!!

We've been so busy that I've hardly had the time to blog!

1. The kitchen cabinets have arrived and they are being installed now!

2. The carpet is being installed on the 26th.

3. The interior paint is more than 50% completed; we are waiting on Jimmy Watkins Drywall to return and make some last-minute repairs.

4. We had the trash and debris hauled from the property and three trees cut down to make the property visible form the street.

5. Sierra Windows has been paid a deposit and I handed the manager of SW the second of three checks.

6. The kitchen appliances have been purchased and are ready to be installed as soon as the kitchen assembly is completed.

7. Both bathrooms have new light fixtures, as well as the hallway, entry, and dining area.

8. The fireplace is in the process of being remodeled.

9. We have purchased new floor moldings and are having them installed!

Everything is looking great!